Central Valley School District #356
Progress Elementary
2004 Annual Public Notice
Asbestos hazard Emergency Response Act (AHERA)
As a result of the 2004 AHERA 3-year reinspection, the following known or assumed asbestoc containing building materials (ACBMs) have been identified in the Progress Elementary School building.
Non-Friable ACBM:
- Vinyl floor tile and adhesives (Rooms 112,114,115,209,211,213,214,217)
- Pipe lagging, joints, elbows, and tees (attic above hallways)
Friable ACBM:
All ACBM listed avoce were found to be in good condition and are being continually maintained in accordance with all Washington State and Federal Laws.
Note: In compliance with the U.S. Environmental Protection Agency (EPA) Asbestos Hazard Emergency Act (AHERA), Central Valley School District contracted with Educational Service District 101 of Spokane, Washington to conduct the Three-Year Asbestos Reinspection of all school buildings. During August 2004, an EPA accredited asbestos Inspector and Management Planner performed the required inspection, reassessed each category of asbestos containing building materials (ACBM) and noted any significant changes from the 1989, 1992, 1995, 1998 and 2001 inspections. Reinspection will assist the school district in the process of safely managing each ACBM within our district.
The AHEAR Reinspection Report and Management Plans are available to the general public and can be reviewed anytime during normal school hours. As required by AHEAR, a designated person is available during regular business hours to answer any questions concerning ACBM in our buildings. The designated person can be contacted through the district office.
|
|